Terminals
To ensure stuffing/unstaffing containers and their longer storage we offer a comprehensive network of inland off-dock terminal facilities adjacent to on-dock terminal with rail and road connections.
Modul Terminal (St. Petersburg)
Terminal A (Syktyvkar)
Terminal Shuvakish (Yekateringburg)
Modul Terminal(St. Petersburg)
At the beginning of 2008 Modul Company put into operation a new terminal-logistics complex - Modul Terminal. New state-of-the-art facility is favorably located in Moskovsky district of St. Petersburg in the industrial area Predportovaya adjacent to the city Ring Road and Pulkovskoe Shosse, in 10 km from St. Petersburg Sea Port. ![]()
Since 2008 a zone of customs control for bonded cargo has been put into operation.
Since 2010 on the terminal facility territory of "Modul Terminal" Co. Ltd. in St. Petersburg a temporary storage warehouse has been operating which allows it to handle cargo arrived or shipped by railway or by road in any customs mode.
Site features and dimensions:
1. total area of facility: 12 hectares
2. container terminal area- 7,2 hectares
3. simultaneous storage capacity for empty boxes - 8000 TEU (7 tiers)
4.simultaneous storage capacity for loaded boxes - 1100 TEU (5 tiers)
5. simultaneous storage capacity for plugged-in reefers - 120 pcs
6. total area of open storage grounds for general cargo and for loading/unloading of containers - 20000 sq. m.
7. total area of buildings - 4299 sq.m.
8. covered sheds for general cargo storage - 2400 m2
9. 6 rail tracks with total length of 2500 m (simultaneous handling of 2 block trains)
10. 3 check points for road vehicles
11. Pre-terminal railway station - "Predportovaya"
Link with the city transport communications and railway.
Predportovaya railway station provides functioning of the terminal owing to the route scheduling of arriving and departing block trains with ISO containers and delivery/removal of the universal rolling stock with general cargo.
Apart from the railway communication the terminal facility functioning is provided with truck motorways of the inner-city network. The existing road "7th Predportovy passage" going out to Pulkovskoe highway which is a comfortable access thoroughfare to the port infrastructure of Saint-Petersburg and an exit to the main international highways is taken as the basic artery of road communication.
Types of loading and unloading works at the terminal:
1. Handling of block trains (loading/unloading of loaded and empty ISO containers);
2. Unloading/loading of ISO containers (loaded, empty) from motor vehicles;
3. Unloading/loading of general and other types of cargo from covered and open railway rolling stock and motor vehicles to the warehouse;
4. Loading/unloading of general and other types of cargo i
nto ISO containers (including reloading according to the variant: Motor vehicle - container);
5. Unloading/loading of heavylift and out-of-gauge cargo from the rolling stock and motor vehicles with the following containerization of this cargo (loading onto FLAT RACK; OPEN TOP, etc.);
6. Handling hazardous cargo (except IMO7)
7. Cargo packaging with special equipment of "Titan" and "Signode" companies allowing to package pulp in piles into enlarged packages with the weight up to 1200 kg![]()
8. Reefer area with cable wiring system and capacity from 40 to 120 containers of simultaneous storage, with possibility of intermediate storage of reefer cargo and dispatch of containers with reefer block trains or motor vehicles to the consignee.
9. Cargo storage on the temporary storage warehouse ("Modul Terminal" Co. Ltd. is included into the register of temporary storage warehouse owners)
Two railway ramps with total area of 4500 sq.m. have been built for loading and unloading of wagons and containers.
Terminal and logistic facility capacity:
1. container depot
- loading/unloading containers to/from railway rolling stock - 400 units/day
- loading/unloading containers to/from road vehicles - 500 units/day
2. transhipment facility
- loading/unloading breakbulk cargoes to/from covered wagons - 1000 tons/day
- loading/unloading breakbulk cargoes to/from semi-wagons- 2500 tons/day
- loading/unloading out-of-gauge and heavylift cargoes to/from open-top rolling stock - 10 units/day
- loading/unloading breakbulk cargoes to/from road vehicles - 500 tons/day
containers' stuffing/unstuffing - 2000 tons/day
Machinery:
1. container depot
- Laden container reach-stackers with lifting capacity of 45 tons - 4 pcs
- Empty container reach-stackers with lifting capacity of 30 tons - 3 pcs
- 8-tier lift trucks - 2 pcs
- Terminal tractors - 4 pcs
2. transhipment facility
- Mobile crane with lifting capacity of 50 tons - 1 pc.
- Lift truck with lifting capacity of 32 tons - 1 pc.
- Lift truck with lifting capacity of 22 tons - 1 pc.
- Lift truck with lifting capacity of 10 tons - 1 pc.
- Lift truck with lifting capacity of 7 tons - 1 pc.
- Lift truck with lifting capacity of 4 tons - 2 pcs.
- Lift truck with lifting capacity of 2,5 tons - 3 pcs.
- Lift truck with lifting capacity of 1,5 tons - 3 pcs.
All transhipment machinery has a full set of load gripping attached equipment which allows to handle any type of breakbulk, heavylift or out-of-gauge cargoes.
Recently the facility machinery pool has been replenished with "Joloda" which allows to stuff cargo up to 28 tons into containers without lift trucks and to provide optimum inner stowage.
3. railway front
- Maneuver locomotive ТЕМ2М - 1 pc.
- Maneuver locomotive ТГМ4А - 1 pc.
Options of operations at the terminal and logistic facility:
1. Platform (Wagon, open top wagon) -Warehouse /and vice versa;
2. Truck (Trailer) - Warehouse /and vice versa
3. Container -Warehouse /and vice versa
4. Wagon -Container /and vice versa
5. Truck - Container /and vice versa
6. Container - Container.
Opening hours:
1. container depot (24/7)
2. transhipment complex (from 8 a.m. till 8 p.m.,7 days a week)
Director of the terminal - Sergey Timoshenko
Tel.: +7(812)702-52-46, 702-52-13
Email: tso@modul.spb.ru
Terminal A (Syktyvkar)
The facility is located in Syktyvkar , Komi republic, on the territory of Mondi Business Paper Syktyvkar LPK.
Site dimensions
- Total area: 4 500 m2
- Area designed for containers' storage:4000 m2
- Storage capacity (TEU): 580 TEU
- Throughput capacity (container/day): 400 boxes
- maintenance depot
- 24 hour security
Loading tracks: 1 track
Equipment: 2 gantry cranes of 50 tons capacity
Services:
- receipt and dispatch of 20' and 40' boxes by railways and road transport
- loading/unloading of rail cars
- storage of empties and laden containers
- dispatch of shuttle blocktrains to St. Petersburg
- maintenance depot
Opening hours
Transhipment complex (from 8 a.m. till 8 p.m.,7 days a week)
Director of the Terminal - Denis Kalinin
Tel.: +7( 8212)-69-85-17, +7(8212)-69-95-14
Email - dkalinin@modul.spb.ru
Terminal Shuvakish(Yekaterinburg)
Located in immediate proximity to railway station Shuvakish, (Sverdlovskaya Railway) the terminal is equipped with access rail sidings and is the sole company in Yekaterinburg entitled to receive and dispatch empty/laden containers.
Site dimensions
- Total area: 6900 m2
- Area designed for containers' storage:3900 m2
- Storage capacity (TEU): 700 TEU
- Throughput capacity (container/day): 50 boxes
- 24 hour security
Loading tracks: 2 tracks
Equipment:
- Forklift with lifting capacity of 65 tons
- Gantry crane (12,5 tons)
Services:
- receipt and dispatch of sea and railway containers (RZDU) by railways and road transport
- loading/unloading of rail cars
- storage of empty and laden boxes of different shipping lines
- dispatch of shuttle blocktrains with empty containers to the consignors' enterprises for stuffing
Opening hours
Transhipment complex (from 8 a.m. till 8.30 p.m.,7 days a week)
Director of the terminal - Yory Kniss Tel.: +7(343)-376-11-18
Email - shuvakish@modul.spb.ru
